Current Projects
A key goal of the Parramatta River Catchment Group (PRCG) is to improve ecosystem health across the catchment. One of our primary strategies is to protect, restore, and reconnect riparian vegetation along creeks and tributaries, providing vital habitat and movement corridors for native flora and fauna – including the catchment’s five iconic indicator species.
The project aims to:
- Naturalise where possible
- Enhance the viability, condition, connectivity, and extent of nature riparian vegetation
- Provide a corridor for the movement of flora and fauna species between reserves and areas of remnant vegetation
- Protect and/or provide bank and creek bed stability
- Contribute to improved water quality.
Project objectives and scope
In June 2023, the PRCG was awarded a $1,000,000 grant over three years (July 2023 – June 2026) as part of a NSW Government Election Commitment to deliver the Parramatta River Bank Naturalisation and Priority Corridors project.
The project is structured around three key objectives:
- Strategic policy: Develop a consistent policy framework to protect and enhance existing riparian vegetation across local government boundaries.
- Site prioritisation: Map the catchment and identify high-priority sites for riverbank revegetation and naturalisation.
- On-ground delivery: Fund and deliver initial on-ground bank naturalisation and revegetation works at priority locations.
The project covers riparian corridors across the PRCG’s 10-member council Local Government Areas, including major tributaries such as Duck River, Tarban Creek, Hawthorne Canal, and Grantham Creek, while excluding the main Parramatta River foreshore between Charles Street Weir and Cockatoo Island.
The project will fund specialists or consultants to deliver the following:
Stage One
- Conduct a literature review, drawing on council and agency existing data sets
- Undertake catchment mapping
- Conduct workshops with councils, agency members and Sydney Water to establish and publish priority corridors for restoration across the catchment
- Develop riparian planning controls/LEP clause for member councils.
Stage Two
- Design a capital works program with concept and detailed designs for specific projects, prepare cost estimates, and coordinate approvals for capital works project.
Stage Three
- Undertake capital works at priority sites (identifying any opportunity for co-funding by landowners and other grants).
Implementation of the Parramatta River Masterplan
Launched in 2018, Duba, Budu, Barra – Ten Steps to a Living River: The Parramatta River Masterplan outlines the roadmap to making the Parramatta River swimmable again and restoring its ecological health. The Bank Naturalisation and Priority Corridors project directly advances two core Masterplan steps:
- Step 4: Standardise and Standards (see page 70) – Establish a whole-of-catchment land-use policy and statutory planning mechanism.
- Step 8: Bring in Nature (see page 78) – Maintain, improve, and create new habitats for the Parramatta River catchment’s five iconic species mascots as indicators of water quality and catchment health.
Progress and work completed to date
Since launching in mid-2023, the project has progressed from governance and catchment-wide mapping into site-specific detailed designs and on-ground delivery:
| 2023: Project governance established Project Working Group, consisting of representatives from member councils and the Sydney Olympic Park Authority (SOPA), was formed to guide delivery. Supported by the PRCG Coordinator, the Working Group meets regularly and reports to the PRCG Executive and Full Group. |
| 2024: Stage 1 – Catchment mapping and prioritisation framework Specialist consultants were appointed to complete Stage 1 of the project, delivering a comprehensive literature review, spatial mapping of riparian zones across the catchment, a prioritisation framework, and a preliminary list of priority sites for restoration. |
| 2025: Stage 2 – Site selection, community consultation, and concept design A dedicated Project Officer was appointed to coordinate Stage 2. Following community consultation across Hunters Hill and Blacktown, consultants Civille developed concept plans and cost estimates for six shortlisted sites. Four priority sites, Grantham Creek (Blacktown), Tarban Creek (Hunters Hill), Duck River (Cumberland), and Hawthorne Canal (Inner West), were selected for funded capital works, while Archer and Vineyard Creeks were identified as potential shovel-ready design candidates subject to residual funding. |
| 2026: Stage 3 – Detailed design, project extension, and initial on-ground works The NSW Department of Climate Change, Energy, Environment and Water (DCCEEW) approved a project extension through to March 2027 to allow full delivery of on-ground works across the four priority sites: 1. Grantham Creek (Blacktown City Council): MoU and addendums signed and grant funds distributed. Plant propagation and site preparation commenced, with native riparian planting rolling out from October 2026. 2. Tarban Creek (Hunters Hill Council): Detailed design drawings and the Review of Environmental Factors (REF) were completed and reviewed. Tender processes are scheduled to commence ahead of January 2027, with construction timed for winter 2027 to avoid flying-fox camp breeding season. 3. Duck River (Cumberland City Council): 80% detailed design drawings and Bill of Quantities (BOQ) completed, with procurement pathways being finalised alongside council. 4. Hawthorne Canal (Inner West Council): First Nations consultation completed with strong community support; detailed design and REF preparation are progressing in coordination with Transport for NSW. |
| 2027: Project close-out (To March 2027) Finalisation of detailed designs, tenders, and grant fund transfers for remaining participating councils, completion of on-ground riparian restoration works, and final project reporting to DCCEEW. |
Project details and contact
Funded by:
NSW Government Department of Climate Change, Energy, Environment and Water
Amount:
$1,000,000 over three years from July 2023 to June 2026 (extended to March 2027).
More information:
Melissa Cate Christ, Project Officer
Email: melissa.cate.christ@ourlivingriver.com.au
Program overview
The Parramatta River Catchment Group (PRCG) Stormwater Compliance and Education Program aims to reduce stormwater runoff and pollution at its source to improve water quality and habitat health across the catchment.
Unlike wastewater, stormwater generally enters local creeks and the Parramatta River untreated, carrying pollutants such as litter, sediment, nutrients, and chemicals.
The program promotes a proactive, coordinated approach to stormwater management, with a focus on consistent planning and compliance practices, ongoing asset maintenance, industry education, and community engagement.
Program objectives and intended outcomes
The program focuses on four key areas:
- Stormwater infrastructure management: Improve the management, maintenance, and compliance of public and private Water Sensitive Urban Design (WSUD) assets and Stormwater Quality Improvement Devices (SQIDs) to reduce stormwater pollution and improve waterway health.
- Council capacity building: Strengthen the capacity of member councils to develop and deliver effective stormwater education, management, and compliance programs through shared resources, training, and consistent policies and practices.
- Erosion and sediment control: Expand the reach and impact of the Get the Site Right (GTSR) campaign through coordinated compliance activities, industry education and training to improve erosion and sediment control practices on building and construction sites.
- Litter prevention: Identify priority litter issues and hotspots across member council areas and coordinate evidence-based, catchment-wide litter prevention initiatives to reduce the amount of litter entering waterways.
Together, these initiatives aim to improve regulatory consistency, strengthen council and industry capability, increase compliance, encourage behaviour change, and deliver long-term improvements in water quality and catchment health.
Masterplan alignment
The program directly supports the delivery of three key steps in Duba, Budu, Barra – Ten Steps to a Living River: The Parramatta River Masterplan:
- Step 4: Standardise the Standards – Establish consistent, catchment-wide planning controls, operational requirements, and maintenance obligations for stormwater infrastructure.
- Step 5: Reduce Stormwater Runoff – Improve the design, management, compliance, and ongoing maintenance of public and private stormwater assets.
- Step 7: Involve the Community – Deliver coordinated education, industry training, compliance, and community behaviour-change initiatives to reduce litter, construction sediment, and other pollutants entering waterways.
Summary of the 2022 Wave Consulting Stormwater Audit
To establish an evidence base for reform, the PRCG and Wave Consulting Australia conducted a comprehensive audit in 2022 examining how public and private stormwater devices were being managed and maintained across the catchment, including an inspection of 254 private assets across 50 properties in seven member council LGAs.
Key Findings:
- 87% of audited private assets had never been maintained (with only 9% maintained in the past 12 months).
- 77% of property owners (73% in follow-up owner interviews) did not know what the stormwater asset on their property did or why it was installed.
- 14% of assets no longer existed or were never built.
- 8% of assets had completely failed, and only 5% of on-site detention (OSD) devices displayed required identification plates.
- Only 3 out of 50 property owners were able to estimate ongoing maintenance costs.
While public stormwater assets such as Gross Pollutant Traps (GPTs), bioretention systems, litter booms, and streetscape raingardens were generally found to be in average condition, the audit warned that without dedicated maintenance plans, sustainable budgets, and stronger compliance frameworks, degrading private and public devices pose a significant long-term risk to river health and flood resilience.
Key program initiatives and progress to date
1. Water Sensitive Urban Design (WSUD) Uplift Project
Established directly in response to the 2022 audit, the WSUD Uplift Project addresses institutional silos across council planning, development engineering, and compliance teams, as well as inconsistent expectations among certifiers, developers, and property owners.
- Stage 1 (Completed 2026): Delivered catchment-wide council surveys, capacity-building workshops, and technical troubleshooting sessions on private WSUD lifecycles, development assessment, and compliance. Stage 1 received a Highly Commended award from Stormwater NSW at the 2026 Franc Conference in Canberra and was shortlisted for the Local Government NSW Environment Awards and NSW Stormwater Excellence Awards.
- Stage 1 (Completed 2026):
- Delivered catchment-wide council surveys, capacity-building workshops, and technical troubleshooting sessions on private WSUD lifecycles, development assessment, and compliance.
- Developed a fact sheet on Understanding Stormwater for Strata Properties.
- Stage 1 received a Highly Commended award from Stormwater NSW at the 2026 Franc Conference in Canberra and was shortlisted for the Local Government NSW Environment Awards and NSW Stormwater Excellence Awards.
- Stage 2 (In Progress 2026–2027): Developing practical operational and maintenance guidelines tailored to two core audiences:
- Stream A: Council staff, planners, development engineers, developers, and certifiers.
- Stream B: Strata managers and private property owners responsible for maintaining on-lot stormwater devices.
- Catchment Compliance Pilot: Participating councils are establishing multidisciplinary teams (supported by Executive Sponsors) to prepare for a coordinated WSUD Compliance Program Pilot launching in 2027/2028.
2. Litter Prevention Program
Funded initially through an $80,000 NSW EPA Waste and Sustainable Materials Strategy (WASM) Stream 2 grant, the PRCG finalised the Parramatta River Litter Prevention Roadmap in 2026, aligned with the Greater Sydney Harbour Litter Prevention Strategy 2030.
- Stream 3 Implementation Grant ($435,000): Secured in 2026 over three years to roll out a five-year catchment-wide litter prevention program – designed to become self-funding in years four and five by shifting council expenditure from reactive clean-up to proactive source prevention.
- Governance & Data: Established the PRCG Litter Prevention Working Group (LPWG) (first convened September 2026) and recruited a dedicated Data / GIS Officer to establish baseline litter data, update Cost of Litter studies, and build a SQID Prioritisation Framework for Gross Pollutant Traps and street sweeping.
3. Get the Site Right – Erosion and Sediment Control
Now marking 10 years of impact, Get the Site Right is a joint taskforce between the PRCG, Cooks River Alliance, Georges Riverkeeper, Sydney Coastal Councils Group, NSW regional councils, and NSW Environment Protection Authority (EPA), to prevent sediment runoff from construction sites polluting waterways. For detailed information, visit the Get the Site Right page.
- Biannual Inspection Blitzes: Coordinated catchment-wide compliance blitzes in March 2026 and August 2026 alongside the NSW EPA.
- Industry training: Hosted an Erosion and Sediment Control Training workshop in August 2026 for 70 industry and council participants.
- 10-year milestone & advocacy: Hosted an industry-wide 10-year anniversary forum in October 2026, presented a national case study at the International Erosion Control Association (IECA) conference, and commenced work on a Construction Sediment Management Discussion Paper quantifying the clean-up cost of sediment pollution to local councils.
| WSUD Uplift Project | Regional Litter Prevention | Get the Site Right |
| 2023-2024 | ||
| Established project framework in response to the catchment WSUD and OSD asset management audit. | Identified key regional litter issues across member council LGAs as part of program objectives. | Delivered bi-annual compliance blitzes across member council LGAs in partnership with the NSW EPA and neighbouring catchment groups. |
| 2025 | ||
| Conducted a catchment-wide survey across council business units to identify institutional silos, knowledge gaps, and private WSUD compliance barriers. | Secured an $80,000 NSW EPA WASM Stream 2 grant and commenced drafting the catchment-wide Parramatta River Litter Prevention Roadmap with the Stormwater Subcommittee. | Drafted a Get the Site Right case study with Griffith University’s Coast Adapt program; updated educational material; continued biannual compliance blitzes. |
| 2026 | ||
| Stage 1 Completed: Delivered three catchment-wide workshops and small-group technical sessions; awarded a Stormwater NSW Highly Commended award and finalised the Stage 1 Report. | Completed Litter Prevention Roadmap; secured a $435,000 three-year NSW EPA grant to roll out a five-year catchment-wide litter prevention program; established the Litter Prevention Working Group. | Hosted an industry-wide 10-year anniversary forum on erosion and sediment control; continued bi-annual compliance blitzes. |
Project Details
Grant Funding: $800,000 over four years to July 2027 (Stormwater Compliance & Education Program), plus $435,000 over three years (NSW EPA WASM Stream 3 Litter Prevention Roadmap Implementation)
Funded by: NSW Government Department of Climate Change, Energy, Environment and Water (DCCEEW) and NSW Environment Protection Authority (EPA)
More information:
Angela Dunnett, Stormwater Compliance and Education Officer.
Email: angela.dunnett@ourlivingriver.com.au
The Parramatta River flows through the geographic heart of Sydney and one of the fastest growing regions in Australia. Making the river swimmable delivers on the sustainability and liveability goals in the Greater Sydney Commission’s District Plans and is core to achieving the vision for Sydney’s Central River City.
Step 4 of the Parramatta River Masterplan is focused on reviewing the strategic and statutory planning frameworks that contribute to delivering our vision for a world class river. Working closely with our partners, our review has resulted in the release of a recommendations paper, Strategic and Statutory Planning Review to Create Our Living River.
The paper sets out three broad areas for planning reform:
- Simple updates to council’s Local Environment Plans (LEPs) and Development Control Plans (DCPs), to adopt over the next few years. These changes will ensure that development does more to reduce stormwater pollution and foster healthy ecosystems.
- Developing, piloting and adopting two new frameworks for improving waterway health outcomes in new development:
- A Blue Green Index Tool for assessing development applications
- A Blue Green Grid for riparian mapping
- Working with our project partners and stakeholders to strengthen and support waterway health considerations in all planning approval pathways. This will require broader reform beyond the remit of local government.
Standardise the Standards – Final Recommendations Paper
Download the full Final Recommendations Paper
Recommendations Paper Executive Summary
Download the Recommendations Paper Executive Summary
To get an overview of this planning reform work, please watch this short video.
Final Recommendations Paper Webinar Series
The consultancy team from Civille and Macquarie University held a series of short webinars in order to share the key recommendations in the recently released paper for Step 4: Strategic and Statutory Planning Review to Create Our Living River and get attendees thinking about how we move the recommendations into implementation.
Webinar 1: Improving local planning provisions for diffuse stormwater pollution and waterway health
This webinar provides council and agency staff with an overview of the drivers for policy reform to address the issues of diffuse stormwater pollution and waterway health in new development. It covers the recommendations contained within the recently released paper for Step 4: Strategic and Statutory Planning Review to Create Our Living River, focusing on the two key policy directions: the blue green index for WSUD and green infrastructure and the blue-green grid of waterway and riparian land. The webinar then goes into some detail on the actions specific to councils on updating their Local Environment Plans and Development Control Plans.
Webinar 2: A blue-green index to reduce diffuse stormwater pollution
This webinar introduces the proposed new blue-green index tool. We explain how we think this new tool can address the complex planning issues that exist in stormwater management in Sydney. We also look at the proposed features of this new tool and compare it to similar tools that have been adopted in Australia and elsewhere. We will then go into the steps required to pilot the tool and a discussion on the challenges.
Webinar 3: Blue-green grid for improved waterway health
This webinar introduces the concept of a blue-green grid for the Parramatta River catchment. It is suitable for council and agency staff interested in waterway and catchment management, strategic planning and biodiversity conservation. We discuss the reasons why we need the blue-green grid, how it could be implemented across the catchment, and the next steps required to develop the grid.
Learn more about Step 4 of the Parramatta River Masterplan – Standardise the Standards.